Laserfiche WebLink
• QUARTERLY MONITORING <br /> I <br /> REPORT <br /> I <br /> 1.0 INTRODUCTION <br /> The following is a chronological listing of activities at the California Tank Lines (CTL) Stockton <br />' terminal relevant to removal of underground storage tanks (USTs) and determination of the <br /> vertical and lateral extent of contamination <br /> ACTIVITY DATE BY <br /> Remove Waste Oil USTs 1990 Bill Messick Co <br /> Determine Extent of Contamination ' 1997 Sierra-Pacific (SP) <br /> Remove Diesel USTs 1998 Station Equip Co <br /> Determine Extent of Contamination 1999 Environeering, Inc (EI) <br /> Determine Extent of Contammatlon3 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Report4 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Reports 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Reports 2001 Environeering, Inc (EI) <br />' Quarterly Monitoring Report' 2001 Environeering, Inc (EI) <br /> Quarterly Monitoring Reports 2001 Environeering, Inc (EI) <br /> Quarterly Monitoring Report9 2001 Environeering, Inc (EI) <br />' Quarterly Monitoring Report10 2002 Environeering, Inc (EI) <br /> I Reference— Work Plan Dated 08/28/1996 <br />' Report of Investigation Dated 02/04/1997 <br /> 2 Reference— Work Plan Dated 01/28/1999 <br />' Report of Investigation Dated 02/03/2000 <br /> s Reference— Work Plan Dated 05/01/2000 <br /> Work Plan Addendum Dated 05/11/2000 <br />' Report of Investigation Dated 01/23/2001 <br /> 4Reference — Quarterly Monitoring Report Dated 05/15/2000 <br /> 5 Reference— Quarterly Monitoring Report Dated 08/31/2000 <br /> 6Reference— Quarterly Monitoring Report Dated 01/29/2001 Q4, 2000 <br />' 7 Reference— Quarterly Monitoring Report Dated 06/18/2001 Q 1, 2001 <br /> Environeering,Inc Project No 02 004 15 Page 1 <br />