Laserfiche WebLink
1 <br /> QUARTERLY MONITORING <br /> REPORT <br /> 1 <br /> 1.0 INTRODUCTION <br /> The following is a chronological listing of activities at the California Tank Lines (CTL) Stockton <br /> terminal relevant to removal of underground storage tanks (USTs) and determination of the <br /> vertical and lateral extent of contamination <br />' ACTIVITY DATE BY <br />' Remove Waste Oil USTs 1990 Bill Messick Co <br /> Determine Extent of Contamination 1997 Sierra-Pacific (SP) <br /> Remove Diesel USTs 1998 Station Equip Co <br /> Determine Extent of Contamination 1999 Environeering, Inc (EI) <br /> Determine Extent of Contamination2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Report4 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Reports 2000 Environeerrng, Inc (EI) <br /> Quarterly Monitoring Report 2001 Environeering, Inc (EI) <br />' Quarterly Monitoring Report 2001 Environeering, Inc (EI) <br /> Quarterly Morutoring Report8 2001 Environeering, Inc (EI) <br />' 1 Reference— Work Plan Dated 08/28/1996 <br /> Report of Investigation Dated 02/04/1997 <br /> 2 Reference— Work Plan Dated 01/28/1999 <br /> Report of Investigation Dated 02/03/2000 <br /> 3 Reference— Work Plan Dated 05/01/2000 <br />' Work Plan Addendum Dated 05/11/2000 <br /> Report of Investigation Dated 01/23/2001 <br />' 4 Reference Quarterly Monitoring Report Dated 05/15/2000 <br /> 5 Reference— Quarterly Monitoring Report Dated 08/31/2000 <br />' 6 Reference— Quarterly Monitoring Report Dated 01/29/2001 <br /> 7 Reference— Quarterly Monitoring Report Dated 06/18/2001 <br /> s Reference— Quarterly Monitoring Report Dated 08/02/2001 <br /> Environeering,Inc Project No 01-009 012 Page 1 <br />