Laserfiche WebLink
QUARTERLY MONITORING <br /> 1 REPORT <br /> 1 <br /> 1 1.0 INTRODUCTION <br /> The following is a chronological listing of activities at California Tank Lines (CTL) Stockton <br /> 1 terminal relevant to removal of underground storage tanks (USTs) and determination of the <br /> vertical and lateral extent of contamination <br /> 1 ACTIVITY DATE BY <br /> 1 Remove Waste Oil USTs 1990 Bill Messick Co <br /> Determine Extent of Contamination ' 1997 Sierra-Pacific (SP) <br /> 1 Remove Diesel USTs 1998 Station Equip Co <br /> Determine Extent of Contamination 1999 Environeermg, Inc (EI) <br /> Determine Extent of Contamination2000 Environeermg, Inc (EI) <br /> Quarterly Monitoring Report4 2000 Environeermg, Inc (EI) <br /> Quarterly Monitoring Reports 2000 Environeermg, Inc (EI) <br /> Quarterly Monitoring Report6 2001 Environeering, Inc (EI) <br /> 1 1 Reference— Work Plan Dated 08/28/1996 <br /> Report of Investigation Dated 02/04/1997 <br /> 1 2 Reference— Work Plan Dated 01/28/1999 <br /> Report of Investigation Dated 02/03/2000 <br /> 1 3 Reference— Work Plan Dated 05/1/2000 <br /> Work Plan Addendum Dated 05/11/2000 <br /> Report of Investigation Dated 01/23/2001 <br /> 1 °Reference— Quarterly Monitoring Report Dated 05/15/2000 <br /> 5 Reference— Quarterly Monitoring Report Dated 08/31/2000 <br /> 1 6 Reference— Quarterly Monitoring Report Dated 01/29/2001 <br /> 1 CTL contracted EI to complete the required Quarterly Monitoring Report for the Site at 3105 <br /> South El Dorado Street, Stockton The location is shown in Figures 1 and 2 <br /> 1 <br /> 1 <br /> Environeering,Inc Project No 01-003 10 Page 1 <br /> 1 <br />