My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009319
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
ARCHIVED REPORTS XR0009319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:58:08 PM
Creation date
7/24/2019 4:43:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009319
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the groundwater gradient present beneath the site The groundwater direction of flow was <br /> calculated to be southeasterly at a gradient of 0 0112 ft/ft <br /> 3.0 FINDINGS <br /> 3.1 Groundwater Level Measurements <br /> As measured on 22 December 1999, groundwater was present at a depth of 29 92 ft btc (below <br /> top of casing) in MW-1 and at a depth of 30 40 ft btc in MW-3 On 27 January 2000, the <br /> groundwater level in the two (2) groundwater monitoring wells were again measured by EI The <br /> groundwater was present at a depth of 28 70 btc in MW-1 and at a depth of 28 60 btcs in MW-3 <br />• This limited data indicates a southerly flow at a gradient of 0 01 ft/ft on 22 December 1999 The <br /> gradient dropped to 0 0036 ft/ft on 27 January 2000 <br /> The groundwater was measured on 20 April 2000 and found to be at a depth of 25 62, 25 99 and <br />• 25 55 feet below top of casing (btc) (MW-1, MW-2 and MW-3 respectively) The groundwater <br />• direction of flow was calculated to be southeast at a gradient of 0 0027 ft/ft <br /> The groundwater was measured on 26 July 2000 and found to be at a depth of 28 00, 28 25 and <br /> 27 90 feet below top of casing (btc) (MW-1, MW-2 and MW-3 respectively) The groundwater <br /> direction of flow was calculated to be southeast at a gradient of 0 0031 ft/ft <br /> Groundwater is present beneath the site at a depth of 29 21, 28 60, 29 10 and 28 65 feet below <br /> top of casing (btc), as measured on 21 November 2000 in the four groundwater monitoring wells <br />• (MW-1, MW-2, MW-3 and MW-4 respectively) installed on site The groundwater direction of <br /> i flow was calculated to be southeasterly at a gradient of 0 0112 ft/ft <br /> The groundwater level dropped in the past quarter The gradient increased significantly with the <br /> addition of data from the fourth monitoring well <br /> 0 <br /> 0 <br />• <br /> 40 <br /> 3D <br /> 0 Environeermg,Inc Project No 01-00109 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.