My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009324
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
ARCHIVED REPORTS XR0009324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:57:05 PM
Creation date
7/24/2019 4:43:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009324
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
View images
View plain text
r REPORT OF INVESTIGATION <br /> r <br /> OF THE EXTENT OF CONTAMINATION FROM FORMER <br /> i <br /> UNDERGROUND STORAGE TANKS <br /> 1.0 INTRODUCTION <br />• The following is a chronological listing of activities at California Tank Lines (CTL) Stockton <br />• terminal relevant to removal of underground storage tanks (USTs) and deternunation of the <br />. vertical and lateral extent of contamination <br /> ACTIVITY DATE BY <br /> Remove Waste Oil USTs 1990 Bill Messick Co <br /> Determine Extent of Contamination 1 1997 Sierra-Pacific (SP) <br /> Remove Diesel USTs 1998 Station Equip Co <br /> Determine Extent of Contamination 1999 Environeering, Inc (EI) <br /> S Determine Extent of Contamination 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Report 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Reports 2000 Environeering, Inc (EI) <br /> ' Reference — Work Plan Dated 08/28/1996 <br />• Report of Investigation Dated 02/04/1997 <br /> 2Reference— Work Plan Dated 01/28/1999 <br />. Report of Investigation Dated 02/03/2000 <br /> 3 Reference— Work Plan Dated 05/1/2000 <br /> Work Plan Addendum Dated 05/11/2000 <br /> 4 Reference— Quarterly Monitoring Report Dated 05/15/2000 <br />• 5Reference — Quarterly Monitoring Report Dated 08/31/2000 <br /> • Environeenng,Inc Project No 00-01108 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).