My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009325
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
ARCHIVED REPORTS XR0009325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:57:19 PM
Creation date
7/24/2019 4:43:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009325
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> r <br /> r <br /> i <br /> ri QUARTERLY MONITORING <br /> r <br /> REPORT <br /> r <br /> r <br /> r 1.0 INTRODUCTION <br /> i <br /> r The following is a chronological listing of activities at California Tank Lines (CTL) Stockton <br /> i terminal relevant to removal of underground storage tanks (USTs) and determination of the <br /> r vertical and lateral extent of contamination <br /> r ACTIVITY DATE BY <br /> i Remove Waste Oil USTs <br /> 1990 Bill Messick Co <br /> i Determine Extent of Contamination 1 1997 Sierra-Pacific (SP) <br /> i <br /> r Remove Diesel USTs 1998 Station Equip Co <br /> r. Determine Extent of Contamination 1999 Environeering, Inc (EI) <br /> r ) <br /> r Determine Extent of Contamination 2000 Environeering, Inc (EI) <br /> r <br /> r Quarterly Monitoring Report4 2000 Environeenng, Inc (EI) <br /> r 1 Reference— Work Plan Dated 08/28/1996 <br /> i Report of Investigation Dated 02/04/1997 <br /> i 2Reference— Work Plan Dated 01/28/1999 <br /> r Report of investigation Dated 02/03/2000 <br /> r 3 Reference— Work Plan Dated 05/1/2000 <br /> i Work Plan Addendum Dated 05/11/2000 <br /> r <br /> i 4Reference— Quarterly Monitoring Report Dated 05/15/2000 <br /> r <br /> i CTL contracted EI to complete the required Quarterly Monitoring Report for the Site at 3105 <br /> r South El Dorado Street, Stockton The location is shown in Figures 1 and 2 <br /> i <br /> P& <br /> i <br /> iEnvironeenng,Inc Project No 00-008 07 Page <br /> r <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.