Laserfiche WebLink
r <br /> QUARTERLY MONITORING <br /> r <br /> REPORT <br /> r <br /> 1.0 INTRODUCTION <br /> r The following is a chronological listing of activities at California Tank Lines (CTL) Stockton <br /> 1 <br /> ternunal relevant to removal of underground storage tanks (USTs) and determination of the <br /> vertical and lateral extent of contamination <br /> ACTIVITY DATE BY <br /> Remove Waste Oil USTs 1990 Bill Messick Co <br /> 1 <br /> Deterimne Extent of Contammation 1997 Sierra-Pacific (SP) <br /> Remove Diesel USTs 1998 Station Equip Co <br /> 1 <br /> Determine Extent of Contamination 1999 Environeernng, Inc (EI) <br /> Deternune Extent of Contamination3 2000 Environeenng, Inc (EI) <br /> Reference— Work Plan Dated 08/28/1996 <br /> Report of Investigation Dated 02/04/1997 <br /> r 2 Reference— Work Plan Dated 01/28/1999 <br /> Report of Investigation Dated 02/03/2000 <br /> 3 Reference— Work Plan Dated 05/11/2000 <br /> CTL contracted EI to complete the required Quarterly Monitoring Report for the Site at 3105 <br /> South El Dorado Street, Stockton The location is shown to Figures 1 and 2 <br /> i <br /> This Quarterly Monitoring Report summarizes the groundwater monitoring activities completed <br /> at the site in the first quarter of 2000 <br />� 0 <br /> Enwroncering,Inc. Project No 00-006 06 Page 1 <br /> I <br />