Laserfiche WebLink
06/29/2005 13:55 2099519352 VILLAGE WEST PIAPINA PAGE 05 <br />Nor 03 0:5 08t08p t a Dott:en (2L 533-2650 p.3 <br />In -Tank Gauging / SIR Equipment: <br />[]Chet* this box if hulk gauging is uwd ottly for inve:ttoq control and disregard ilce following section. <br />EDCheck this box if no lank gauging or SIR equipment is utstatled and disregard the following section. <br />(This section must be completed if in -tank gauging equipment is used to pertu,ari leak detection morinoring). <br />Complete the folio Ing checklist: <br />Yes [] No" Has 811 input wiring been inspeCted for proper entry and termination. including testint for ground faults? <br />Yes [j No• Were all tank -ganging probes visually inspected for damage and residue buildup? <br />Ycs ❑ Nos Was accuracy of,Qystero prcrduci level reaciings tested? <br />❑ Yes Ne Was accuracy of system water lcvel readings tared',' <br />Yes ❑ No* %Vere all probes reins(alltd properly? -- <br />❑ Yets ❑ NO* Were all items on dta equipment manufacturer's maintenance chxkhst completed'? <br />" <br />in the Section H. below, describe how and when these defii lencles were or will be corrected. <br />G. Line Leak Detectors (LLD). <br />3 Check this box if LLDs are not installed and disrcgtird Iho following sct;6041. <br />D Yes <br />0 No' <br />For agaipmettt etan-up or annual equiptneitt cartilication, was a leak simulated to \'cnfy LLD performance'? <br />❑ N/A <br />(Check all that app(v) Simulated leak rote, 0 3 g.p.h. ; ❑ 0.1 g.p.11 ; ❑ 0.2 ggh. <br />❑ Yes <br />® No* <br />Were all LLDs oonfirmed operational and accurate wheels regulatory requirements? <br />Yes <br />No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />No* <br />For mechanical I_Mx, does the LLD restrict product ftorN' if it detects a leak? <br />N/A <br />Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LU) detects a leak! <br />N/A <br />_ <br />{� Yes <br />❑ No* <br />For olaotronic LLDs, does the turbine automatical1v shut off if anv gonion of the ruonitoring system is disabled <br />® N/A <br />or discotuimted? <br />Ycs <br />No* <br />For electronic LLDs, docs the turbine automatically, shut off if any portion of the monitoring system <br />WA <br />malfunctions or fails a icm? _ <br />Yes <br />No* <br />For electronic LLDs, have ali accessible Nvirirb conliections been visually inspected'? <br />Yee; <br />® No* <br />Were all items on the equipment manufacturer's waintenance checkirst complmcd' <br />" In the Section H, below, describe how ting when these amciencie,% were or ►vat oc currectca. <br />H. Comments. Lines and LLDs were not tested. The monitoring system was iu such unworkable <br />condition that it was decided to voluntarily shut down the facility until repairs could be implemented and <br />monitoring restored. At that time line tests and LLD tests will be performed. <br />Fitge 3 of 3 03101 <br />