My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
COMPLIANCE INFO 2004 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 8:52:05 AM
Creation date
7/24/2019 4:44:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2011
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br />U" SAN JOAQUIN COUNTY <br />/1-0-11 <br />P•......, o <br />a; ?� Donna K. Heran, RE.H.S. 304 East Weber Avenue, Third Floor <br />Director <br />Al Olsen, R.E.H.S. Stockton, California 95202-2708 <br />• c .. Program Manager <br />Laurie A. Cotulla, R.E.H.S.Telephone: (209) 468-3420 <br />Program Manager Fax: (209) 464-0138 <br />July 23, 2004 <br />Elite IV Contractors <br />2535 Wigwam Dr. <br />Stockton CA 95205 <br />Re: Village West Marina @ 6649 Embarcadero CA 95219 <br />Unit Supervisors <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S. <br />Your permit application to install new spill buckets and a drop tube at the above referenced <br />location has been approved with the following conditions: <br />Contact EHD to schedule the following appointments: <br />a. Prior to backfilling the new spill buckets, EHD must inspect the riser for <br />cathodic protection. <br />b. EHD must verify the overfill prevention system is in compliance with CCR 2635 <br />(b)(2). Note: Your company may chose to have EHD onsite during the overfill <br />prevention system installation so that portions of the system do not have to be <br />disassembled/reassembled. <br />c. The spill buckets must be tested to ensure they hold a minimum of 5 -gallons. <br />2. A tank integrity test must be performed once concrete is poured, prior to the contractor <br />signing off of the jobsite. This office must receive results within 7 days of completing <br />work. <br />3. Contact the Fire Department and San Joaquin Valley Air Pollution Control District for <br />applicable permits. <br />4. Allow 48-hour advance notice for scheduling inspections with this office. <br />5. This permit expires October 23, 2004. <br />If you have any questions please contact me at (209) 468-9847. <br />Thank you, <br />Michelle Le, REHS <br />Senior Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.