Laserfiche WebLink
Elite IV Contractors <br />6649 Embarcadero Rd., <br />Stockton CA 95219 <br />Re: Village West Marina @ 6649 Embarcadero Rd., Stockton <br />The permit application to explore the monitoring system failures at the above referenced site <br />has been approved with the following conditions: <br />1. A complete description of work performed must be submitted prior to repairing or <br />replacing any portion of the monitoring system. <br />2. All monitoring equipment used must be listed in LG -113. <br />3. If any piping is to be repaired or replaced or if concrete is broken over underground <br />piping, Environmental Health Department (EHD) must be notified so that an <br />inspection can be arranged. Soil sampling, may be necessary per EHD assessment. <br />Additionally, all required inspections related to a piping retrofit must be scheduled <br />with this office. Per EHD assessment of findings, new plans and a permit application <br />may be required to be submitted. <br />4. Manufacturers specification sheets including instructions for the repair must be <br />submitted prior to beginning the repair. Per EHD assessment of findings, new plans <br />and a permit application may be required to be submitted. <br />5. If sumps or dispenser pans are repaired/replaced a 24-hour lake test will be required. <br />6. If concrete is broken near the underground storage tank, then a 3rd party tank integrity <br />test must be performed once the site is returned to operating conditions. Results must <br />be received by EHD within 7 days of returning the site to operating condition. <br />7. If concrete is broken near the underground piping, then a 3rd party line integrity test <br />must be performed once the site is returned to operating conditions. Results must be <br />received by EHD within 7 days of returning the site to operating condition. <br />8. Notify EHD of all third party test dates. <br />9. Notify EHD once work is complete. A final inspection will be required. <br />To schedule an inspection appointment contact Michelle Le, REHS at (209) 468-9847. <br />Thank you, <br />Michelle Le, REHS <br />Senior Registered Environmental Health Specialist <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />SAN JOAQUIN COUNTY <br />cr ?� <br />Donna K. Heran, R.E.H.S. <br />Director <br />304 East Weber Avenue, Third Floor <br />Unit Supervisors <br />P <br />Carl Borgman, R.E.H.S. <br />Al Olsen, R.E.H.S. <br />Stockton California 95202-2708 <br />Mike Huggins, R.E.H.S., R.D.I. <br />F <br />a <br />Program Manager <br />Telephone: (209) 468-3420 <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />F o <br />Laurie A. Cotulla, R.E.H.S. <br />Program Manager <br />Fax: (209) 464-0138 <br />Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S. <br />June 11, 2004 <br />Elite IV Contractors <br />6649 Embarcadero Rd., <br />Stockton CA 95219 <br />Re: Village West Marina @ 6649 Embarcadero Rd., Stockton <br />The permit application to explore the monitoring system failures at the above referenced site <br />has been approved with the following conditions: <br />1. A complete description of work performed must be submitted prior to repairing or <br />replacing any portion of the monitoring system. <br />2. All monitoring equipment used must be listed in LG -113. <br />3. If any piping is to be repaired or replaced or if concrete is broken over underground <br />piping, Environmental Health Department (EHD) must be notified so that an <br />inspection can be arranged. Soil sampling, may be necessary per EHD assessment. <br />Additionally, all required inspections related to a piping retrofit must be scheduled <br />with this office. Per EHD assessment of findings, new plans and a permit application <br />may be required to be submitted. <br />4. Manufacturers specification sheets including instructions for the repair must be <br />submitted prior to beginning the repair. Per EHD assessment of findings, new plans <br />and a permit application may be required to be submitted. <br />5. If sumps or dispenser pans are repaired/replaced a 24-hour lake test will be required. <br />6. If concrete is broken near the underground storage tank, then a 3rd party tank integrity <br />test must be performed once the site is returned to operating conditions. Results must <br />be received by EHD within 7 days of returning the site to operating condition. <br />7. If concrete is broken near the underground piping, then a 3rd party line integrity test <br />must be performed once the site is returned to operating conditions. Results must be <br />received by EHD within 7 days of returning the site to operating condition. <br />8. Notify EHD of all third party test dates. <br />9. Notify EHD once work is complete. A final inspection will be required. <br />To schedule an inspection appointment contact Michelle Le, REHS at (209) 468-9847. <br />Thank you, <br />Michelle Le, REHS <br />Senior Registered Environmental Health Specialist <br />