Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
•) QUARTERLY MONITORING <br /> 1 <br /> REPORT <br /> 1 <br /> 1.0 INTRODUCTION <br /> The following is a chronological listing of activities at the California Tank Lines (CTL) Stockton <br /> terminal relevant to removal of underground storage tanks (USTs) and determination of the <br /> vertical and lateral extent of contamination <br />' ACTIVITY DATE BY <br /> Remove Waste Oil USTs 1990 Bill Messick Co <br /> Determine Extent of Contamination 1997 Sierra-Pacific (SP) <br /> Remove Diesel USTs 1998 Station Equip Co <br />' Determine Extent of Contamination 2 1999 Environeering, Inc (EI) <br /> Determine Extent of Contamination' 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Report2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Reports 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Report 2001 Environeering, Inc (EI) <br /> Quarterly Monitoring Report? 2001 Environeering, Inc (EI) <br /> Quarterly Monitoring Report8 2001 Environeering, Inc (EI) <br /> Quarterly Monitoring Report9 2001 Environeering, Inc (EI) <br /> Quarterly Monitoring Report to 2002 Environeering, Inc (EI) <br /> Quarterly Monitoring Report11 2002 Environeering, Inc (EI) <br /> Quarterly Monitoring Report 12 2002 Environeering, Inc (EI) <br />' i Reference— Work Plan Dated 08/28/1996 <br /> Report of Investigation Dated 02/04/1997 <br />' 2 Reference— Work Plan Dated 01/28/1999 <br /> Report of Investigation Dated 02/03/2000 <br /> 3 Reference— Work Plan Dated 05/01/2000 <br /> Work Plan Addendum Dated 05/11/2000 <br /> Report of Investigation Dated 01/23/2001 <br /> i4 Reference— Quarterly Monitoring Report Dated 05/15/2000 <br /> 5 Reference— Quarterly Monitoring Report Dated 08/31/2000 <br /> i <br /> iEnvironeering,Inc <br /> Prosect No 02 009 17 Page 1 <br /> i <br />