Laserfiche WebLink
APR-16-2010 07: 15P FR0f'1: TO: 120946EC433 P.2 <br /> r <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> IINDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> - 490.54a <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> ❑ I CONTINUOUS ELECTRONIC MONITORING JX2.FLOAT AND CHAIN ASSEMBLY ❑ 3 ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99 OTHER(Specify): <br /> PANEL MAN UFACFURER 490 ss MODEL#: 490-56. <br /> --- — -- ----- <br /> -- 490-s7 d 490-sa <br /> LEAK SENSOR MANUFACTURER: MODEL (S) <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ o.YES 91b NO 490.69 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a, YES 95 b.NO 490.60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES gf b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER a YES ❑b.NO 490.62 <br /> 49063 <br /> 2.UDC CONSTRUCTION IS 1$1.SINGLE-WALLED ❑2.DOUBLE"-WALLED <br /> 490-64a <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY:_LIQUID ❑2 PRESSURE ❑3 VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 190-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING. THIS FACILITY HAS BEEN NOTIFIED BY THE STATF WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65 <br /> LEAK DETECTION(ELD)MUST BE PERFORMED PERIODIC ELD IS PERFORMED EVERY-36 MONTHS AS REQUIRED 23 CCR 82644- <br /> ---- — —_ - 490-66 <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED_EVERY 36 MONTHS_ <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLti'. 490.67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility <br /> Alarm logs 490.68& Visual Inspection Records 490-68b ❑Tank integrity testing results 490-68c <br /> SIR testing results(and supporting documentation records). 490-6ed ❑ Tank gauging results(and supporting documentation records). 490-680 <br /> ❑ATG Testing results(and supporting documentation records) 490.68f ❑ Corrosion Protection 60-day logs 490-688 <br /> Equipment maintenance and calibration records. 490.68h <br /> IX.TRAINING <br /> 79 Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirlob duties. 490.69. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-696 <br /> OPFRATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490a9c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69& <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-696 <br /> ❑ OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified In this UST Monitoring Plan <br /> • The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMM ENTS/ADDITIONA.L INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan 490.71 <br /> S <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person( are res onsible for performing the monitoring and equipment maintenance 490-71 <br /> NAME ACr)G� 490.72 TITLE <br /> 490-7s <br /> NAME 490-74 TITLE <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the informa'on provided herein is true and accurate to the best of my knowledge. 490-77 <br /> APPLICANT SIGNATURE 490-76 DATE <br /> ia �„ <br /> PP ` 490.78 490-79 <br /> APPLICANT NAME( tint): APPLICANT TITLE: <br /> VZ nLo c <br /> NIA <br /> UPCF UST-D(12/2007)3/4 A�pro� 7^� r �r� � L�`�ice` � 1 ��/ <br /> �� �,L9 �r <br />