Laserfiche WebLink
001202 <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 One form per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Rol. <br /> T. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) _ t <br /> BUSINESS NAME(Same as FACILITY NAME) 3 <br /> BU INESS ITE ADDRESS 103. BUSINESS SIT CITY 104. <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> D Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous,. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> D We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> I Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CON'T'ROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment PP P q 'pmeat is repaired or replaced as necessary <br /> EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: (Complete only i a !cable <br /> EQUIPMENT LOCATION AVAH.ABILITY <br /> RIO. R20. R30. <br /> RI I. R21. R31. <br /> RI 2. R22. R32. <br /> R13. R23. R33. <br /> RI4. R24. R34. <br /> RIS. 1125. <br /> R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NA Rao. TITL <br /> rt A-n- fl � Rso. <br /> R4 1. TITLERst. <br /> L l <br /> NAME Rae. TITLE R52, <br /> NAME R43. I TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑1.ADDITIONAL SYSTEM TESTING OR DATA COLLECTION 2. INSPECTION BY QUALIFIED PERSONS ❑3. RECALIBRATION OF 13QUIPMENT R60• <br /> [199.OTHER(Specify): R61. <br /> UN-022B-1/3 www.unidocs.org Rev.04/02/08 <br />