My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2325
>
2900 - Site Mitigation Program
>
PR0542548
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 11:40:58 AM
Creation date
7/25/2019 11:39:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0542548
PE
2950
FACILITY_ID
FA0024468
FACILITY_NAME
LONGHORN PORTFOLIO
STREET_NUMBER
2325
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95330
APN
19811014
CURRENT_STATUS
01
SITE_LOCATION
2325 W LOUISE AVE
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• This proposal includes costs for removal and off-site disposal of two (2) drums of <br /> drill cutting and decontamination waste.The costs assume that the IDW generated <br /> will be classified as non-hazardous waste.The IDW will be disposed of at an <br /> appropriate permitted facility in accordance with applicable regulations; and <br /> • Preparing a Limited Subsurface Investigation Report documenting the methods, <br /> procedures, field and analytical results, and presenting applicable conclusions and <br /> recommendations. The summary report will include a comparison of the results <br /> with applicable regulatory criteria and guidance values; a site plan with sampling <br /> locations; and completed subsurface logs including PID measurements, sample <br /> intervals, and soil descriptions. <br /> Nova proposes to invoice project expenses on a lump sum basis, unless specified otherwise, <br /> in accordance with the above-referenced cost estimate. This cost estimate assumes a <br /> standard 7-day turnaround time for laboratory analytical results. <br /> This proposal assumes that Level D safety precautions are adequate for all work performed <br /> at the Site. A health and safety plan will be developed prior to mobilization, based on these <br /> assumptions. Additionally, Nova requests that the client provide available as-built plans or <br /> similar documents including the location(s) of underground utilities and structures prior to <br /> commencement of field activities. <br /> SCHEDULE <br /> Nova will proceed with the scope of work immediately upon signed authorization and site <br /> access. It is anticipated that the fieldwork will require three (3) days on Site. <br /> A verbal notification of the laboratory analytical findings will be provided within two (2) <br /> business days of the laboratory results receipt, followed by the Limited Subsurface <br /> Investigation report. It is anticipated that the entire scope of work will be completed <br /> within 25 to 30 business days of written authorization. This schedule assumes that San <br /> Joaquin County drilling permit approval will be received within 10 business days of <br /> authorization. Schedule is dependent on Site access requirements, subcontractor <br /> availability,weather, laboratory holiday schedules, or any other unforeseen circumstances. <br /> LONGHORN PORTFOLIO 2325 W.LOUISE <br /> PAGE 3 JANUARY 3,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.