My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3147
>
3500 - Local Oversight Program
>
PR0544705
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2019 10:46:33 AM
Creation date
7/29/2019 10:39:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544705
PE
3526
FACILITY_ID
FA0003754
FACILITY_NAME
CALIFORNIA FUELS
STREET_NUMBER
3147
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512003
CURRENT_STATUS
02
SITE_LOCATION
3147 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Page 1 of 1 <br /> Vicki McCartney [EH] <br /> From : Tim Cuellar [tcuellar@advgeoenv. coml <br /> Sent: Wednesday, October 31 , 2012 3:49 PM <br /> To: Vicki McCartney [EHj <br /> Subject: RE: Pacific Pride - South EI Dorado Street <br /> Vicki, <br /> We are still in the process of installing the dual phase extraction (DPE) remediation system. The <br /> entire remediation equipment has been delivered to the site, and is secure in a fenced compound. <br /> However, I am still waiting on PG&E to install service, and we are having another issue with the <br /> City of Stockton in that they want us to install to sewer discharge point a couple hundred feet <br /> away from site next to Cal Tank Lines building, however there is a lateral connection only 75 <br /> feet away located on the Pac Pride property. The City of Stockton engineers don't have plans of <br /> this connection, so I believe they have to conduct dye test to prove flow is toward sewer main. <br /> I am hopeful that we can have the remediation system installed during December 2012. Please let <br /> me know if you have any questions. <br /> Thanks - Tim <br /> Timothy J . Cuellar <br /> Senior Project Geologist <br /> Advanced GeoEnvironmental , Inc. <br /> Stockton • Santa Rosa o Monterey a Brea = Spokane a Reno a Dallas <br /> 1 -800-511 -9300 <br /> tcuellar advgeoenv. com <br /> www. advgeoenv. com <br /> This email/fax message is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any <br /> unauthorized review, use, disclosure or distribution of this email/fax is prohibited. If you are not the intended recipient, please <br /> contact the sender by email/fax and destroy all paper and electronic copies of the original message. <br /> From: Vicki McCartney [EH] [mailto:vmccartney@sjcehd .com] <br /> Sent: Monday, October 22, 2012 12: 59 PM <br /> To: tcuellar@advgeoenv.com <br /> Subject: Pacific Pride - South EI Dorado Street <br /> Good afternoon Tim , <br /> Has the dual phase extraction remediation system been installed and is it operating at Pacific Pride - <br /> South EI Dorado Street at 3147 South EI Dorado Street in Stockton? <br /> Vicki McCartney, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton , California 95205 <br /> Phone: (209) 468-9852 <br /> Email: vmccartneyna.sicehd.com <br /> 10/31 /2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.