Laserfiche WebLink
i <br /> ' 10 August 2006 , <br /> i AGE-NC Project No. 97-0301 <br /> Page 6 of 6 � <br /> • Continued quarterly depth-to-water measurements in all monitoring wells at the site, but <br /> ' reduced ground water sampling frequency at wells MW-2; MW-3 and MW-6 from a <br /> quarterly to an annual program; AGE believes that continued quarterly ground water <br /> sampling from these wells at this stage of the investigation is not cost effective and will <br /> provide minimal information to supplement the ongoing investigation. Annual sampling X10 <br /> events should be adequate to monitor ground water impact at these wells and should be re- <br /> evaluated on an annual basis. <br /> ' -d TPH-k and TPH-mo from the site's ground water monitoring �,�V <br /> • Elimination of TPH �' � 1��� � <br /> program. t <br /> 6.0. LINUTATIONS '3 <br /> Our professional.services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities. The findings were based upon <br /> analytical results provided by an independent laboratory.Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from review of previous consultants reports <br /> ' ' • and a limited number of available data points(ground water data/samples)and subsurface conditions <br /> may vary away from these data points. No other warranty, expressed or implied, is made as to the <br /> professional interpretations, opinions, and recommendations contained in this report. <br /> ' Advanced GeoEnvironmental,Inc. <br />