Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
' i • 24 March 2004 <br /> AGE-NC Project No 97-0301 <br /> Page 5 of 5 <br /> 5.0. RECOMMENDATIONS <br /> Based upon data collected during September 2003, AGE recommends <br /> ' Continued ground water monitoring utilizing wells MW-1 through MW-12 The next <br /> quarterly ground water monitoring event is tentatively scheduled for March 2004 <br /> i ' Based on the entire set of data collected to date, additional ground water monitoring wells/soil <br /> borings are not warranted at this time and the,existing monitoring well network may be sufficient <br /> ' to complete a site Corrective Action Plan(CAP) <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation ofthe hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from review of previous consultants reports <br />� ' . and a limited number of available datapoints(ground water samples)and subsurface conditions may <br /> vary away from these data points No other warranty, expressed or implied, is made as to the <br /> professional interpretations, opinions and recommendations contained in this report <br /> r <br /> i <br /> ' Advanced GeoEnvironmental,Inc <br /> I' , <br />