Laserfiche WebLink
TAME 2 • <br /> Ground Water Elevations <br /> PACIFIC PRIDE- SOUTH EL DORADO STREET, 3147 South El Dorado Street, Stockton, California <br /> Well Number Depth to Ground Ground Water <br /> Casing Elevation Well Screen Interval Casing Elevation Sampling Date Water Elevation <br /> Screen Interval <br /> 12-20-99 29.31 -1687 <br /> 03-10-00 24.99 -1255 <br /> 06-15-00 25.94 -1350 <br /> 09-14-00 29.31 -1687 <br /> MW-1 30 to 50 feet 12.44 12-28-00 29.00 -1656 <br /> 03-30-01 27.04 -1460 <br /> 06-27-01 29.25 -1681 <br /> 09-26-01 32.02 -1958 <br /> 12-20-01 30-57 -1813 <br /> 03-01-02 28.91 r -1647 �. <br /> 12-20-99 29.20 -1679 <br /> 03-10-00 24.83 -1242 <br /> 06-15-00 25.88 -1347 <br /> 09-14-00 2922 -1681 <br /> MW-2 30 to 50 feet 12.41 12-28-00 2986 -17.45 <br /> 03-30-01 26.91 -1450 <br /> 06-27-01 2909 -1668 <br /> 09-26-01 3189 -1948 <br /> 12-20-01 3044 -1803 <br /> 03-01-02 2876 -1635 - <br /> 12-20-99 2976 -1674 <br /> 03-10-00 2572 -1270 <br /> 06-15-00 2675 -1373 <br /> 09-14-00 2998 -1696 <br /> MW-3 30 to 50 feet 1302 12-28-00 2945 -1643 <br /> 03730-01 2746 -14.44 <br /> 06-27-01 2968 -1666 <br /> 09-26-01 3238 -19.36 <br /> 12-20-01 3122 -18.20 <br /> 03-01-02 2935 -16.33 — <br /> Advanced <br /> 16.33f-Advanced GeoEnvironmental,Inc <br />