Laserfiche WebLink
1 <br /> 25 October 2001 <br /> AGE-NC Project No 97-0301 <br /> ' Page 7 of 7 <br /> • Install and continuously operate a ground water extraction system (Interim remediation) in <br /> ' the area ofMW-1 and MW-7 to Inhibit further off-site migration of the fuel-Impacted ground <br /> water plume, if feasible <br /> ' Installation of additional shallow and deep-screened ground water monitoring wells based <br /> on the findings of the existing shallow ground water monitoring wells and CPT soil borings, <br /> the screen intervals for the deep-screened monitoring wells will be placed to define and <br /> i <br /> ' monitor the vertical extent of the ground water plume in each Informal hydrologic unit <br /> Review of historic records, including records on file with the local fire department,building <br /> ' department or planning division and cross-referenced telephone directories, to identify <br /> potential hydrocarbon fuel sources on or near the property, <br /> • Review of EDR Sanborn Fire Insurance Maps(if available) and aerial photographs to assess <br /> the possibility of usage, storage and disposal of hydrocarbon fuels at the site or on <br /> surrounding properties <br /> 5.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> ' upon analytical results provided by an independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpe of this Investigation are made from a limited number <br /> ' of available data points (CPT data and gro water samples), and subsurface conditions may vary <br /> away from these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> 1 <br /> Advanced GeoEnvironmental,Inc <br />