Laserfiche WebLink
Advanced <br /> IFr <br />-� GeoEnvironmental,, jj <br /> at <br /> 29 September 2000 <br /> AGE-NC Project No 97-0301 <br /> Ms Carol Oz <br /> San Joaquin County PHS-EHD <br /> 304 East Weber Avenue, 3`d Floor <br /> Stockton, CA 95202 <br /> Subject: Addendum to Monitoring Well Installation Work Plan -September 2000 <br /> PACIFIC PRIDE <br /> 3147 South El Dorado Street, Stockton, California <br /> Dear Ms Oz <br /> At the request of Mr David Atwater of Van De Pol Enterprises Inc ,Advanced GeoEnvironmental, Inc has <br /> prepared this work plan addendum for the drilling and installation of four ground water monitoring wells at <br /> 3147 South El Dorado Street, Stockton, California Three additional ground water monitoring wells will be <br /> installed to determine the horizontal extent of petroleum-impacted ground water,one deeper screened ground <br /> water monitoring well will be installed to determine the vertical extent of hydrocarbon-impacted ground <br /> water The enclosed work plan addendum was prepared as required by the San Joaquin County Public Health <br /> Services-Environmental Health Division(PHS-EHD)by letter dated 10 August 1999 <br /> Upon San Joaquin County Public Health Services Environmental Health Division approval of the work plan <br /> addendum,AGE will submit an application for drilling permit,permit fee and any additional documentation <br /> required for permitting purposes If you have any questions or require further information,please contact me <br /> at(209)467-1006 <br /> Sincerely, <br /> Advanced GeoEnvironmental,Inc. <br /> I <br /> Timothy J ue ar <br /> Project Geologist <br /> Enclosure <br /> cc Mr David Atwater,Van De Pol Enterprises Inc <br /> JOMr Marty Hartzell, California Regional Water Quality Control Board-Central Valley Division <br /> 4005 North WiNon Wary Stoc.l.ton Callform 195205 { <br /> Telephone (209)467-1006 FAX (209)467-1118 <br />