My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009167
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3147
>
3500 - Local Oversight Program
>
PR0544705
>
ARCHIVED REPORTS XR0009167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2019 11:05:01 AM
Creation date
7/29/2019 10:55:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009167
RECORD_ID
PR0544705
PE
3526
FACILITY_ID
FA0003754
FACILITY_NAME
CALIFORNIA FUELS
STREET_NUMBER
3147
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512003
CURRENT_STATUS
02
SITE_LOCATION
3147 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Quarterly Report - Third Quarter 2000 <br /> PACIFIC PRIDE - SOUTH EL DORADO STREET <br /> ' 3147 South El Dorado Street, Stockton, California <br /> ' 1.0. INTRODUCTION <br /> Advanced GeoEnvironmental,Inc (AGE)has prepared this quarterly report for the third quarter of <br /> ' 2000 for 3147 South El Dorado Street, Stockton, California The site setting is illustrated on Figure <br /> 1 Site structures and monitoring well locations are depicted on Figure 2 <br /> The objective of the work was to monitor dissolved petroleum hydrocarbon concentrations in ground <br /> water and to characterize ground water flow direction and gradient on the site This report is prepared . <br /> ' in accordance with guidelines established by the California Regional Water Quality Control Board - <br /> Central Valley Region for investigation of underground storage tank (UST) sites Background <br /> information is summarized in the Preliminary Investigation and Evaluation Report - June 1999, <br /> ' dated 26 July 1999 and prepared by AGE <br /> ' 20 PROCEDURES <br /> On 14 September 2000, ground water monitoring and sampling was performed at the site on wells <br /> MW-1, MW-2,MW-3 and MW-4 Ground water monitoring procedures for the site were outlined <br /> in Monitoring Well Installation Work Plan - September 1999, dated 01 September 1999, prepared <br /> by AGE and approved by the PHS-EHD by letter dated 23 September 1999 <br /> 1 <br /> 2 1 MONITORING WELL PURGE PROCEDURES <br /> Depths to ground water were measured in each well from the tops of the well casings at the site to <br /> ' the nearest 0 01 foot utilizing a Solmst water level meter Ground water elevations in each well at <br /> the site were calculated by subtracting the measured depth to ground water from the surveyed casing <br /> elevations (Table 1) Ground water elevations were plotted and contoured on a scaled site map <br /> ' (Figure 3) <br /> After water levels were measured, approximately 12 gallons of ground water(a minimum of hree <br /> ' casing water-volumes per well)were removed from wells MW-1,MW-2,MW-3 and MW-4 utilizing <br /> a polyethylene disposable bailer Temperature, pH and conductivity were measured for stabilization <br /> at regular purge-volume intervals from each well using a hydac water analyzer Field data and logs <br /> ' are included with Appendix A Purged ground water was containerized in 55-gallon drums and was <br /> stored on-site in an area lacking general public access <br /> 1 <br /> Advanced GcoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.