Laserfiche WebLink
' Project Pacific Pnd*1 Dorado Project No -NC-97-0301 BORING NO <br /> Site Address 3147 South El Dorado Street Total Depth 40 ft P_2 <br /> ' Stockton, California Date 03 June 1999 <br /> 14 nlling Co Enviroprobe Logged by T Cuellar Page 2 of 2 <br /> Dnll Rig Type Geoprobe 540011 25-inch rods Reviewed by N Henderson <br /> Lithologic Description <br /> Nates• <br /> – Soil probe boring P-2 terminated at 40 feet bsg Grab ground water <br /> samples collected from interval between 36 and 40 feet bsg Boring <br /> P-2 backfilled utilizing portland cement and treinie pipe <br /> ' 50— <br /> ' 60- <br /> 1 <br /> 70— <br /> I � <br /> ' 80— <br /> 1 Advanced <br /> GeoEnvironmental, Inc. <br /> ' L 1AMIPRO1BORING-I4PACPDP2 SAM 47121/99 147 PM <br />