My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
25460
>
2800 - Aboveground Petroleum Storage Program
>
PR0534842
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2019 3:40:12 PM
Creation date
7/30/2019 10:57:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0534842
PE
2832
FACILITY_ID
FA0020087
FACILITY_NAME
GRAB & GO PLAZA
STREET_NUMBER
25460
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20944035
CURRENT_STATUS
01
SITE_LOCATION
25460 SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-a,; jes- �...,o uurstoe of me container for signs of deterio atioa and discharges of oil. <br /> Records olinspections and tests will be keot ar I <br /> rding to usual antl customary business practices <br /> ASTs <br /> • SPCC Requirement[40 CFR 112.8(c)(6)]: The frequency and type of testing must take into account <br /> container size and design,and must combine visual inspection with another testing technique such as <br /> hydrostatic testing,radiographic testing,ultrasonic testing,acoustic emissions testing,or another <br /> system of non-destructive shell testing.You must keep comparison records and you must also inspect <br /> the container's supports and foundations. In addition.you must frequently inspect the outside of the <br /> container for signs of deterioration,discharges,or accumulation of oil inside diked areas. <br /> c <br /> Since the tanks are double walled.SP-001 will allow for inspection of the interstice by WEngineering <br /> for the initial inspection. This inspection was conducted May 25,2016. All four tanks passed(this <br /> includes the six compartments). The inspection report is provided with SPCC. <br /> • At a minimum every 5-years the ne certification process is required <br /> • D>tP �` 1q�Ve[,Monthly and annual inspections of tanks shall be <br /> Weekly 1 <br /> Week j _ "� sok Inspections,verifying liquid level monitors are <br /> p n Checklist is presented in Appendix D. <br /> ��IlAoily��r V', <br /> ' T <br /> t €,1 <br /> + ( qe Containers and equipment w 11 be <br /> btteme so pe <br /> Ees�+O til � is Any written inspection or testing <br /> on,Water Plan for a period of et least flue yeti <br /> will be Incorporated into this SPCC Plan. <br /> tl -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.