Laserfiche WebLink
Spill Prevention Control and Counterrrteasures <br /> Compliance Inspection Pian <br /> Review Page <br /> In accordance with 40 CFR l 12.5(b), a review and evaluation of this SPCC plan is to be conducted <br /> every five years. As a result of this review and evaluation, PG Trading Group will amend this plan <br /> within six (6) months of the review to include more effectivespill prevention and control <br /> technology if such technology will significantly reduce the likelihood of spills at the facility and <br /> the technology is cost effective and field proven at the time of the review. Any amendment of the <br /> SPCC Plan will be certified by a professional engineer within six (6) months of any change in the <br /> facility design, construction, operation, or maintenance which materially affects the facility's <br /> potential for the discharge of oil into or upon the navigable waters of the United States_ <br /> Review Date Signature <br /> 1. <br /> 2. <br /> 3, <br /> 4. <br /> 5- <br /> 6. <br /> 7. <br /> S. <br /> Management Approval <br /> PG Trading Group and Grab &Go Plaza (facility) is committed to the prevention of discharges of <br /> oil to navigable waters of the United States and the environment, and maintains the highest <br /> standards for spill prevention control and countermeasures through regular review,updating, and <br /> implementation of the SPCC Plan for this facility. <br /> Authorized Representative. Mr. N i r m a 1 j i t S B a d i a 1 <br /> Signature: 4 Date: (fJ — ��� <br />