My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009664
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
ARCHIVED REPORTS XR0009664
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:55:48 PM
Creation date
7/30/2019 11:47:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009664
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti ! <br /> ' �eClutGC� �r�C. <br /> ZAV XvApa Rwd <br /> a-4aia. a 95sr <br /> (AW)538 64P41 53f 3838 4 <br /> **AM- K <br /> November 8, 1995 ' <br /> Project No. 358.3 ; <br /> Mr. Harlan Knoll : <br /> c,a ; -• <br /> San Joaquin County PHS/EHD <br /> 304 Weber Street <br /> Stockton,CA 95201 <br /> RE: Groundwater Monitoring Workplan, <br /> Western Lift, 3430 S. El Dorado, Stockton, CA. <br /> Dear Mr. Knoll: <br /> On behalf of the Bank of Stockton, Geological Technics Inc. is pleased to submit <br /> this work plan for a quarterly monitoring event at the above facility in Stockton, <br /> California, along with a survey of the monitoring wells. It is proposed that this <br /> plan serve as a generalized work plan for all future groundwater monitoring <br /> events Conducted by Geological Technics at the Western Lift site. <br /> A Work Plan for a vapor extraction feasibility study has been previously <br /> submitted for approval. Included in the scope of work of that proposal is the <br /> installation of two vapor extraction wells (VEW) that can also be used for <br /> monitoring. It is anticipated that at the time of the first monitoring event in <br /> 1996, all five of the existing will be purged and sampled as will the two VEW <br /> wells which are anticipated to be in place at that time. <br /> PROPOSED WORK PLAN <br /> Scope <br /> All five existing monitoring wells will be checked for depth to groundwater, and <br /> three of these (MW-1, MW-4 & MW-5) will be purged and sampled, and the <br /> samples will be subjected to laboratory analysis. The domestic water well at the <br /> adjacent Cutter Lumber site will also be sampled. All of the water samples will <br /> be sent to Sherwood Laboratory, Hilmar, California, for analysis. The five <br /> monitoring wells are also to be surveyed by a licensed surveyor. A summary <br /> report with groundwater gradient calculations and analytic results will made, <br /> and submitted to the Bank of Stockton and the appropriate regulatory agencies <br /> within 30 days of the monitoring event. A schedule is given below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.