Laserfiche WebLink
TABLE OF CONTENTS <br /> ' Page <br /> 1.0 INTRODUCTION 1 <br /> ' 2.0 BACKGROUND 1 <br /> 2.1 Site Location I <br /> ' 2.2 UST Removal 1 <br /> 2.3 Excavation 1 <br /> 2.4 Monitoring Well Installation 4 <br /> ' 2.5 Groundwater Monitoring 4 <br /> 2.5.1 Groundwater Depth and Gradient 5 <br /> 2.5.2 Petroleum Hydrocarbon Impacted Groundwater 5 <br /> 3.0 PROCEDURES 5 <br /> 3.1 Monitoring Well Purge Procedures 5 <br /> 3.2 Groundwater Sample Collection 5 <br /> 3.3 Soil Boring Installation 5 <br /> ' 4.0 FINDINGS 6 <br /> ' 4.1 Groundwater Elevation 6 <br /> 4.2 Groundwater Flow Direction and Gradient 6 <br /> 4.3 Groundwater Sample Results 7 <br /> ' 4.4 Stratigraphy and Field Observations 7 <br /> 4.5 Analytical Results of Soil Samples 7 <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS 9 <br /> ' 5.1 Hydrocarbon Imapcted Soil 9 <br /> 5.2 Groundwater Contamination 11 <br /> 6.0 LIMITATIONS 11 <br /> i <br />