My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009669
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
ARCHIVED REPORTS XR0009669
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:53:34 PM
Creation date
7/30/2019 11:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009669
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY REPORT <br /> Western Lift <br /> 3430 South El Dorado Street <br /> Stockton, California <br /> August 1994 <br /> 1.0 INTRODUCTION <br /> ' tia of the Bank of Stockton Geological <br /> In accordance with a request from Mr. John Urru <br /> Audit Services, Inc. (GeoAudit) has prepared this Quarterly Report of drilling and sampling <br /> iprocedures at 3430 South El Dorado Street in Stockton, California (the site). The location <br /> of the site is illustrated in Figure 1. A plan of the site is illustrated in Figure 2. <br /> 2.0 BACKGROUND <br /> 2.1 Site Location <br /> The site is located in a flat industrial area south of Stockton (Figure 1). The facility consists <br /> j of a large warehouse and adjoining office and exterior-fenced parking/delivery area (see <br /> Figure 2). Cutter Lumber is located to the north of the site, and currently manufactures <br /> ' wooden pallets. <br /> 2.2 UST Removal <br /> ' Three underground tanks were removed from the delivery area in June of 1991. TPH as <br /> gasoline was detected in three of the seven soil samples collected from the excavation, <br /> indicating that an unauthorized release of hydrocarbons had occurred. The San Joaquin <br /> County Public Health Services - Environmental Health Division (PHS/EHD) required an <br /> assessment of the site. Sample results from the UST removal were summarized in the Site <br /> ' Contamination Workplan dated July 24, 1991. <br /> 2.3 Excavation <br /> The assessment of the site was performed in two phases. Each phase consisted of <br /> ' overexcavation followed by the collection and analysis of soil samples from the walls and <br /> floor of the excavation.The excavation phases and sampling are described in the Preliminary <br /> Investigation and Evaluation Report (PIER, December 11, 1991, prepared by GeoAudit). <br /> ' On May 11992, backfilling of the excavation was completed. The excavation was backfilled <br /> to grade with pea gravel. <br /> CtW.o.l A.&S,�1.4 1 <br /> W.*,1A QRO-W--1.10 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.