My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009685
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
ARCHIVED REPORTS XR0009685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:35:32 PM
Creation date
7/30/2019 11:59:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009685
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S ` <br /> . FALCON ENERGY ASSOCIATESR L <br /> SITE SPECIFIC SAFETY PLAN Sep 1 F 1991 <br /> EWPONMEN FAL HEAL; <br /> This document describes the health and safety ! &666�du�es � .o <br /> the activities planned in performing a preliminary • site <br /> investigation at 3430 S. ELDORADO, STOCKTON CALIFORNIA. , • Ali <br /> j personnel and subcontractors will fofiow this plan. The <br /> prime responsibility for employee safety lies with each <br /> company that is involved in the work for it' s own employees . <br /> It is expressly intended that all project work will comply <br /> with applicable sections of the California Occupational <br /> Health and safety code . All parties working on this project <br /> will maintain a general responsibility to identify and <br /> correct any health and safety hazards and are responsible <br /> for working in a safe manner . <br /> Key Personnel <br /> Project personnel who will have overall responsibility for <br /> the safe operation of this are : <br /> Site Contact: MR, JOHN URRUTIA, VICE PRESIDENT <br /> BANK OF STOCKTON <br /> (209) 941 1375 <br /> • Project manager and (209) 463 7108 <br /> Site Safety Officer <br /> FALCON ENERGY ASSOCIATES: JIM HOBLITZELL <br /> VICE PRESIDENT AND ENVIRONMENTAL MANAGER <br /> REGISTERED ENVIRONMENTAL ASSESSOR, REA-03121 <br /> Project Manager and Safety Officer Responsibilities : <br /> * To conduct initial site safety training for all project <br /> field team members as described in this document, <br /> * To assure all field team personnel have read and <br /> understand the Health and- Safety Plan, <br /> * To assure that all work performed on this project is <br /> conducted in a safe manner , <br /> * To coordinate with field personnel fire-watch, traffic <br /> control and site security, <br />
The URL can be used to link to this page
Your browser does not support the video tag.