Laserfiche WebLink
11 <br /> Bank of Stockton - Cutter Lumber Site Page 7 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 102 2 <br /> 17 February 2000 <br /> ' 3.2 Future Work Schedule <br /> ' Quarterly groundwater monitoring and sampling should continue The San <br /> Joaquin County PHS/EHD directive to submit a Work Plan to further <br /> characterize the extent of the deeper portions of the hydrocarbon contaminant <br /> ' plume, and the feasibility of possible remedial action alternatives has been <br /> suspended pending the results of a feasibility study anticipated for the adjacent <br /> Manna Pro site at 4004 S El Dorado Street It is anticipated that cost pre- <br /> approval for that project will be granted in the near future We propose to <br /> abandon the monitoring well MW-8A at the time drilling is completed at Manna <br /> Pro <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> I <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br />