Laserfiche WebLink
i <br /> DEL-TECH GEOTECHNICAL SUPPORT SERVICES � <br />' MONITORING WELL FIELD LOG 2000 <br />' SAMPLE LOCATION/MW - 6 DATE: 1/20/00 <br />' PROJECT NAME, CUTTER LUMBER ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS- 3430 S ELDORADO SAMPLE TIME 13 50 <br /> CITY,STATE STOCKTON,CALIF SAMPLE CONTAINERS 2 VOA S & I B B <br /> SITE CONTACT. PRESERVATIVES. HCL <br />' CONSULTANT: GEO-PHASE ENVIRONMENTAL LAB.ANALYSIS BY. SHERWOOD <br /> PROJECT MANAGER STEVE LANKFORD MONUMENT: FLUSH <br />' <br /> SAMPLER- DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED: ti WEM WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MED GROUNDWATER P.I.D.READING/ODOR: NIA GAS <br />' TOP OF CASING ELEVATION: MSL COLOR. DARK GREY TO LIGHT GREY <br /> DEPTH TO WATER: (feeL100th's) 2878 FEET CALC.PURGE VOL.: 268464 GAL <br /> DEPTH OF WELL: (feeL100th's) 4523 FEET TOTAL VOLUME PURGED- 9 GAL <br /> STANDING WATER COLUMN: 1645 FEET DEPTH OF PUMP: 43 FEET <br />' FIELD PARAMETERS <br /> TIME CASING DRAW SUBMERS pH E.C. TEMP O R P. rISSOLVEqTURBIDITY <br /> VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE. (DTW) (GPM/LPM) (units) (UsMHOS) (Celsius) (m its) (PPBI) (N T U) <br />' 0 NIA 5 GPM 700 855 187 -98 NIA DRK GREY <br /> 3 700 846 186 -97 1. <br /> 6 702 854 188 -104 LT GREY <br /> 9 702 844 187 -100 " <br /> PURGE METHOD PURGER PUMP <br />' SAMPLE METHOD 1'STAINLESS STEEL BAILER W/STAINLESS STEEL WIRE LWE <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 30 16' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE AMERICAN LOCK INSTALLED <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS <br />' WEATHER OVERCAST SKIPS WIND NW5 <br /> QUALITY CONTROL ALL PURGING N UIPMENT AND SAMPLING EQ UIPMENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br />' CONTAINMENT D O T 1755 GAL, STEEL DRUM OR 60 GAL.POLY DRUM <br /> INSTRUMENTATION Y S I 3560 FLOWCELL Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THERMODINE 580B P I D <br /> KECK INTERFACE METER TURBIDrrY METER <br />