Laserfiche WebLink
' Bank of Stockton- Cutter Lumber Site Page 7 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 102 2 <br /> • $August 1999 <br /> 3.2 Future F r Work Schedule <br />' Based on the data collected during the course of this investigation, Geo-Phase <br /> Environmental Inc anticipates the following work will be completed in the <br /> Ifuture <br /> Quarterly groundwater monitoring and sampling should continue The monthly <br />' depth to groundwater check has been suspended The San Joaquin County <br /> PHSIEHD has issued a directive to submit a Work Plan to further characterize <br /> the vertical and lateral extent of the deeper portions of the hydrocarbon <br /> contaminant plume, and the feasibility of possible remedial action alternatives <br /> We are holding preparation of the work plan in abeyance pending additional <br /> consideration of the deep groundwater issues mentioned above <br /> I <br /> I <br /> I •, <br /> I <br /> I <br /> 1 <br />' 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> 1 <br />