Laserfiche WebLink
I <br /> r <br /> CFO—PHA9F <br /> I <br /> ' - ENVIRONMENTAL <br /> . k <br /> 20 April 1999 } <br /> Project No.: 102.2 :3 <br /> Project Name: BofS(Cutter) <br /> Mr. Pat O'Rourke <br /> Bank of Stockton <br /> P.O. Box 1110 s, <br /> �! Stockton, CA 95201 <br /> He: Report: Winter Quarter 1999 Groundwater Monitoring <br /> Cutter Lumber Site(USTCFP Claim No. 01878) <br /> i� 3422& 3430 S. El Dorado, Stockton, CA <br /> Dear Mr. O'Rourke: <br /> Geo-Phase Environmental Inc. is pleased to submit this Groundwater Monitoring Reportl <br /> documenting the groundwater monitoring work completed at the subject site between t. <br /> January and March of this year. This includes the measuring of depth to water in the site's <br /> nine groundwater monitoring wells in the months of January and early March, and the' ' <br /> collection of groundwater samples for analysis in the wells in the month of March. <br /> f <br /> We appreciate this opportunity to serve your environmental needs. If you have any questions <br /> or comments please do not hesitate to call (209) 569-0293. <br /> { <br /> Re/spec submitted, <br /> t <br /> G -P ase Environ tal Inc. <br /> ;! Stephen M. Lankford, RG, REA <br /> President <br /> Enclosures I <br /> s I <br /> cc: Harlan Knoll, San Joaquin Co. PHS/EHD I <br /> P <br /> I # <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone 209 569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br /> f <br /> I�; <br />