Laserfiche WebLink
1 <br /> GEO-PHASE <br /> � ENVIRONMENTAL <br /> 1 <br /> 1 September 30, 1998 <br /> Project No 1022 <br /> Project Name BofS (Cutter) <br /> 1 Mr Pat O'Rourke <br /> Bank of Stockton <br /> 1 P O Box 1110 <br /> Stockton, CA 95201 <br /> Re Report Summer Quarter 1998 Groundwater Monitoring <br />' Cutter Lumber Site(USTCFP Claim No 01878) <br /> 3422 & 3430 S El Dorado, Stockton, CA <br /> Dear Mr O'Rourke <br /> 1 <br /> Geo-Phase Environmental Inc is pleased to submit this Groundwater Monitoring Report <br />' documenting the groundwater monitoring work completed at the subject site between July <br /> and September of this year This includes the measuring of depth to water in the site's nine <br /> groundwater monitoring wells in the months of July, August and September and the <br />' collection of groundwater samples for analysis in the wells in the month of September <br /> We appreciate this opportunity to serve your environmental needs If you have any questions <br /> or comments please do not hesitate to call (209) 569-0293 <br /> Resp tfully submitted, <br />' Geo-Phase Environmental In <br /> Stephen M Lankford, RG, R A <br /> President <br />' Enclosures <br /> Icc Harlan Knoll, San Joaquin Co PHS/EHD <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone 209 569-0293 <br /> Modesto, CA 95366 Fax(209) 569 0295 <br />