Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br />' MONITORING WELL FIELD LOG 1998 <br />' SAMPLE LOCATION/MW - 1 DATE: 9/15198 <br />' PROJECT NAME. CUTTER LUMBER ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS: 3430 S ELDORADO SAMPLE TIME, 1410 <br /> CITY,STATE STOCKTON,CALIF SAMPLE CONTAINERS 2 VOA'S/ 1 S B <br /> SITE CONTACT PRESERVATIVES HCL <br /> CONSULTANT GEO-PHASE ENVIRONMENTAL LAB ANALYSIS BY. SHERWOOD/WEST <br /> PROJECT MANAGER STEVE LANKFORD MONUMENT FLUSH <br />' SAMPLER DEL-TECH WELL CASING MATERIAL PVC <br /> -SIGNED- WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MED GROUNDWATER P.I.D.READING/ODOR 0 OLD GAS <br />' TOP OF CASING EL ATION: MSL COLOR GREY TO CLEAR <br /> DEPTH TO WATER (feeL100th's) 2664 FEET CALC PURGE VOL 453696 GAL <br /> DEPTH OF WELL: (feeL100th's) 5444 FEET TOTAL VOLUME PURGED. 15 GAL <br />' STANDING WATER COLUMN* 2180 FEET DEPTH OF PUMP, 50 FEE I <br /> FIELD PARAMETERS <br /> lie <br /> TIME CASING DRAW SUBMERS pH E.C TEMP O.R P "LVE TURBIDITY <br /> VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (DTW) (GPMILPM) (units) (UsMH05) (Celsius) (Mvo1 ) (PPM) T U) <br />' 0 N/A 5 GPM 792 1598 223 -156 1 GREY <br /> 5 775 1622 217 -184 08 <br /> 10 768 1630 214 -242 08 CLEAR <br />' 15 7 66 1694 213 -237 07 <br />' PURGE METHOD PURGER PUMP <br /> SAMPLE METHOD 1 STAINLESS STEEL BAME_It W/STAINLESS STEEL WIRE LINE <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 27 33' <br />' WELL INTEGRITY CAP&SEAL ARE SECURE AMERICAN LOCK INSTALLED <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS <br /> IWEATHER CLEAR SKIES WIND NW15 <br /> UALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D.0 T 1755 GAL. STEEL DRUM OR 60 GAL POLY DRUM <br /> INSTRUMENTATION Y S 13560 FLOWCELL Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER TIIERMODINE 580E P I D <br /> KECK INTERFACE METER TURBIDITY BIER <br />