Laserfiche WebLink
' Bank of Stockton- Cutter Lumber Site Page 2 <br /> Summer Quarter Groundwater Momtonng Report <br />' Project No 102 2 <br /> September 30, 1998 <br />' 1.2 Scope of Work <br /> The following work was completed during this round of groundwater monitoring <br />' 1 Monthly depth th to water measurements completed in the months of Jul and <br /> P Y <br />' August <br /> 2 Groundwater monitoring which included sample collection from seven wells <br /> in the vicinity of the northerly (Cutter Lumber) release and two wells in the <br />' vicinity of the southerly (Western Lift) release <br /> 1 � <br /> 1 <br /> 1 ' <br /> i <br /> 1 <br /> 1 <br /> i <br />' 2937 Veneman Ave ,##B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> 1 <br />