Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br />' MONITORING WELL FIELD LOG 1998 <br />' SAMPLE LOCATION/MW - 11 DATE: 6116198 <br /> t PROJECT NAME: CUTTER LUMBER ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS 3430 S ELDORADO SAMPLE TIME: 1226 <br /> CITY STATE- STOCKTON,CALIF SAMPLE CONTAINERS 2 VOA S, 1 BB <br />' SITE CONTACT- PRESERVATIVES. HCL <br /> CONSULTANT. GEO-PHASE ENVIRONMENTAL LAB.ANALYSIS BY. SHERWOOD /WEST <br />' PROJECT MANAGER STEVE LANKFORD MONUMENT FLUSH <br /> SAMPLER: DELTECH WELL CASING MATERIAL PVC <br /> SIGNED: WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MEDIA. GROUNDWATER P.I D.READING I ODOR 0 PPM GAS <br />' TOP OF CASING ELEV ON: MSL COLOR: GREY TO LT GREY <br /> DEPTH TO WATER: (feeL100th's) 2257 FEET CALC PURGE VOL• 3678528 GAL <br /> DEPTH OF WELL- (feeL100th's) 4511 FEET TOTAL VOLUME PURGED 12 GAL <br />' STANDING WATER COLUMN: 2254 FEET DEPTH OF PUMP: 40 FEET <br /> FIELD PARAMETERS <br /> TIME CASING DRAW SUBMERS pH E.C. TEMP ORP PISSOLVEE TURBIDITY <br /> VOLUME DOWN RATE OXYGEN COLOR <br />' PER PURGE (D T'W) (GPM/LPM) (units) (UsMHOS) (Celsius) (Mvolts) (PPM) (N T U) <br /> 1209 0 N/A 1 GPM 813 1236 24 -45 08 GREY <br /> 1213 4 816 1188 213 -20 05 LT GREY <br /> 1211 8 113 1182 201 -38 05 CLEAR <br />' 1221 12 805 1181 203 -52 04 <br />' PURGE METHOD PURGER PUMP <br /> SAMPLE METHOD 1'STA NL.FSS STEEL BAILER W/STAINLESS STEEL WIRE LINE <br />' D T W AFTER PURGE D T W AT SAMPLE TIME 2320 <br /> WELL INTEGRITY CAP&SEAL ARE SECURE AMERICAN LOCK INSTALLED <br /> WELL LOCATION SEE SITE MAP <br />' REMARKS <br /> WEATHER CLEAR SKIES WIND NW15 <br /> QUALITY CONTROL ALL PURGING EQ UIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br />' FIELD WITHA STE4MCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D O T 17 55 GAL STEEL DRUM OR 60 GAL POLY DRUM <br /> INSTRUMENTATION Y S I 3560 FLOWCELL Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE M f-ER THERMODINE 580B P I D <br /> KECK INTERFACE METER TURBIDITY lvIEI'ER <br />