Laserfiche WebLink
' Bank of Stockton Cutter Lumber Site Page 14 <br /> Groundwater Monitoring Well Construction <br />' Project No 102 2 <br /> April 24, 1995 <br />' investigations is very localized and does not represent a material part of the <br /> hydrocarbon contamination at this site <br />' 4.2 Recommendations <br />' Based on the data collected during the course of this investigation, Geo-Phase <br /> Environmental Inc makes the following recommendations <br />' Quarterly groundwater monitoring and sampling should continue The depth to <br /> groundwater should be checked monthly for at least the next two quarters Only <br /> after monitoring has been performed several times will it be possible to <br />' intelligently consider the possibilities for future action It is possible that two to <br /> three additional monitoring wells will be needed to adequately characterize this <br /> release <br /> 1 <br /> I <br /> li <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> • <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> I <br />