Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
1 <br /> 1 � <br /> GEO-PHASE <br /> = ENVIRONMENTAL <br /> 1 <br /> April 24, 1998 <br /> 1 Project No 1022 <br /> Project Name BofS (Cutter) <br /> 1 Mr Pat O'Rourke <br /> Bank of Stockton <br /> 1 P O Box 1110 <br /> Stockton, CA 95201 <br /> Re Report Groundwater Monitoring Well Installation and Winter 1998 Groundwater Monitoring <br /> 1 Cutter Lumber Site (JSTCFP Claim No 01878) <br /> 3422 & 3430 S El Dorado, Stockton, CA <br /> 1 Dear Mr O'Rourke <br /> Geo-Phase Environmental Inc is pleased to submit this report of Phase 11 Environmental <br /> Site Assessment documenting the work completed to evaluate environmental conditions at <br /> 1 the subject Property <br /> This present report documents the drilling and installation of 7 groundwater monitoring <br />�. wells These wells were intended to help define the vertical and lateral extent of gasoline <br /> and diesel in the soil and groundwater In addition, these new wells and the two older, <br /> existing wells were sampled and laboratory testing was performed on the water samples <br /> 1 We appreciate this opportunity to serve your environmental needs <br />' Respectfully submitted, <br /> Geo-Phase viro ntal Inc <br />' Stephen M Lankfo d, RG, REA <br /> President <br /> IEnclosures <br />' cc Harlan Knoll, San Joaquin Co PHSIEHD <br /> Chuck Arnold, USTCFP <br /> 1 <br /> .f <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0295 <br /> I <br />