Laserfiche WebLink
Interim Emergency Remedial Action/Monitoring Well Installation Work Plan Pae 7 <br /> Former Union Facility,-Cutter Lumber <br /> Project No 102 2 <br /> May 20, 1997 <br />' 2.2.2 Extraction Well Development and Sampling <br /> After the well has been allowed to stabilize for at least 48 hours, it will be opened and <br /> sampled to determine if free product is present in measurable amounts If free product is <br /> measured, a skimmer will be installed in the well to remove free product At such time as <br />' free product has been adequately removed (i e , no longer measurable), the well can then <br /> be converted to a normal groundwater monitoring well <br /> 2.2.3 Free Product Skimmer Installation <br /> In the likely event that free product is present beneath the former underground storage <br />' tank location, it will then be possible to use an electrically or pneumatically actuated <br /> skimmer inserted into the well to separate free phase gasoline from ground water and <br /> pump it to the surface for disposal The gasoline would be pumped into a DOT approved, <br />' 55 gallon drum at the surface and periodically collected for recycling The well will not <br /> be used to "pump and treat" groundwater, but merely to remove free liquid from the <br /> groundwater surface <br /> 3.0 PROPOSED INVESTIGAITON <br /> In order to monitor the extent of the hydrocarbon plume in the groundwater, four <br />' groundwater monitoring wells will be installed It is proposed that these wells be located <br /> at positions as shown on the site map and a monitoring program begun at the site One <br /> well will be installed south of the tank pit in the approximated direction of the assumed <br />' up-gradient position The remaining three are at varying distances and directions in the <br /> assumed down-gradient direction (north/northeast) <br />' 3.1 Boring Installation <br /> 3.1.1 Soil Boring Installation <br /> The well borings will be drilled using a 8 inch diameter hollow stem auger rig operated <br /> by a C-57 licensed drilling contractor Soil cuttings will be stockpiled on the location <br />' pending profiling and proper disposal These borings will be logged and sampled by a <br /> licensed California Registered Geologist Upon installation of the borings a monitoring <br /> well will be constructed in each <br />' 3.1.2 Soil Sampling and Analysis <br /> Soil samples will be collected for geological and analytical evaluation at five foot <br /> intervals The samples will be collected using a 2 0 inch diameter (I d) California split <br /> 2937 Veneman Ave , #13240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0295 <br /> I <br />