Laserfiche WebLink
Interim Emergency Remedial Action/Monitoring Well Installation Work Plan Page 9 <br /> Former Union Facility,-Cutter Lumber <br /> Project No 102 2 <br /> May 20, 1997 <br />' 3.2.2 Monitoring Well Development <br /> After the well sealing materials have set (>48 hours) the wells will be developed (using <br /> mechanical surging and pumping, or balling methods) until a clear stream of water is <br /> generated All development water will be containerized in 55 gallon DOT approved <br />' containers and stored on site until their disposition can be arranged <br /> 3.2 3 Monitoring Well Sampling <br />' It is proposed that initially, groundwater samples be collected from each of these wells on <br /> a quarterly basis for a period of one year and depth to water measurements be made on a <br />' monthly basis The following section documents the groundwater sampling protocol <br /> The monitoring wells will be sampled no earlier than 24 hours after development A <br />' groundwater sampling event will then proceed as follows The well is unlocked and <br /> opened The groundwater level will then be measured in each well before any purging of <br /> that well occurs A groundwater level measuring tape with an electronic sensor will be <br /> used This tape has an accuracy to the nearest one-one hundredth of a foot If floating <br /> product is suspected, then a bailer will be lowered into the well to determine the <br /> product/water interface The presence of floating product will affect water elevations and <br /> sampling protocol The sounding tape will be decontaminated before and between <br /> sounding each of the wells <br />' Stagnant water in the well casing is purged using a stainless steel bailer belayed with a <br /> servo actuated electric reel The rate of well purging will be monitored Each well will <br />' be purged of at least three casing volumes and then purged until the groundwater <br /> parameters (temperature, conductivity, and pH) had stabilized indicating that water, <br /> representative of actual aquifer conditions, is entering the well Groundwater parameter <br />' stabilization is by three successive temperature pH and conductivity readings within 10% <br /> Before a sample is collected, the weIl's water level is allowed to recharge to at least 80% <br />' of its initial level A bailer is then used to collect each sample Bailer cleanliness is <br /> assured by collecting a bailer blank (pouring distilled water through the bailer and <br /> collecting it in a VOA vial) prior to collecting the analytical sample Before and in <br /> between uses, all sampling equipment will be washed using a portable steam cleaner <br /> Disposable gloves will be worn by the sampling technician while collecting all samples <br /> and changed between the collection of each sample to reduce the potential for cross- <br /> contamination <br /> Extreme care will be exercised while collecting samples to prevent agitation of the water <br /> contained in the bailer Water samples will be transferred from the bailer into 40 ml <br /> VOA vials preserved with hydrochloric acid and I liter capacity amber glass bottles <br /> 2937 Veneman Ave,##B240 Geo-Phase Environmental Inc Phone(209) 569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />