Laserfiche WebLink
' Interim Emergency Remedial Action/Monitoring Well Installation Work Plan Page 12 <br /> Former Union Facility,-Cutter Lumber <br /> Protect No 102 2 <br /> May 20, 1997 <br />' 6.0 SIGNATURE AND CERTIFICATION <br />' This project will be performed by Geo-Phase Environmental Inc in accordance with <br /> accepted geologic and hydrologic standards of the State of California accepted and in <br /> effect at the time of this investigation Geo-Phase Environmental Inc is not responsible <br /> for undisclosed conditions <br /> This work plan was prepared by <br /> GE <br /> Geo-Phase Environmental Inc. STEPHEN <br /> LANKFORD <br />' s k 4283 <br /> F Cf�1F� <br />' Stephen M Lankfo , <br /> Registered Geologist#4283 <br />' 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br />