Laserfiche WebLink
9 T II` 39 <br /> 1 = PHASE 4V <br /> 1 - ENVIRONMENTAL <br /> REPORT <br />' Groundwater Monitoring <br /> Summer, 1996 <br /> Western Lift Site <br /> I 3430 S. El Dorado Street <br /> Stockton, California <br /> Project No. 102.2 <br /> October 10, 1996 <br /> I <br /> Prepared for <br /> John Urrutia <br /> Bank of Stockton <br /> P.O. Box 1110 <br /> Stockton, California 95201 <br /> Prepared by <br /> Phase One Environmental Inc. <br /> 2937 Veneman Ave.,Sane B240 <br /> Modesto,California 95356 <br />