Laserfiche WebLink
I <br /> DEL-TECH Geotechnical Support Services <br />' MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME.WESTERN LIFT AMPLE ANALYSIS PERFORMED TPH-Gas, S T X E <br />' S ELDORADO STREET AMPLE TIME: 10 40 <br /> STOCKTON,CAAMPLE CONTAINER(S)- HCL PRESERVED <br /> V O A's, 1 LITRE & 1 BAILER BLANK <br /> NALYSIS PERFORMED BY SHERWOOD <br />' CLIENT GEOLOGICAL TECHNICS DATE 03/28/1996 <br /> PROJECT MANAGER- STEVE LANKFORD SAMPLE LOCATION- MW-2 <br />' AMPLER DON LIGHT START TIME <br /> GROUNDWATER. XXX ]�ADDOSE OTHER WELL HEAD P 1 D READING 0 0 PPM <br />' CASING ELEVATION: FEET MSLCASING DIAMETER 2 INCH <br /> DEPTH TO WATER. 3117 FEET CALCULATED CASING VOLUME 3 35 GAL <br />' DEPTH OF WELL 51 70 FEET TOTAL VOLUME PURGED 10 5 GAL <br /> TIME VOLUME pH E.C. TEMP. O.R.P. COLOR OTHER <br /> gallons units Umhoslcm De rens C (Mvolts) (Visual <br /> 0 76 1232 182 NIA TURBID NO ODOR <br />' GRE " <br /> 35 76 1215 182 " <br />' 70 77 1142 184 y " <br /> 105 77 1140 186 " <br /> 1 <br />' PURGE METHOD 3 FOOT STAINLESS STEEL BAILER WITH ELECTRONIC BAILER SPOOL <br /> SAMPLE METHOD: T STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE DEPTH TO WATER AT SAMPLE TIME <br />' WELL INTEGRITY CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS GOOD RECHARGE <br /> WEATHER CLOUDY SKIES <br /> QUALITY CONTROL. ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br />' IN THE FIELD WITH STEAM CLEANER&ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION: EASTERN MOST <br />' CONTAINMENT: POLY DRUMS <br /> INSTRUMENTATION: ORION pHITEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br /> 1 <br />