Laserfiche WebLink
IDEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME WESTERN LIFT SAMPLE ANALYSIS PERFORMED TPH-Gas, 6 T X E <br /> S ELDORADO STREET SAMPLE TIME: 11 50 <br /> STOCKTON,CA SAMPLE CONTAINER(S) HCL PRESERVED <br /> V 0 A's, 1 LITRE & 1 BAILER BLANK <br /> ANALYSIS PERFORMED BY SHERWOOD <br /> ICLIENT GEOLOGICAL TECHNICS DATE 03/28/1996 <br /> PROJECT MANAGER STEVE LANKFORD SAMPLE LOCATION MW-4 <br /> AMPLER DON LIGHT START TIME <br /> GROUNDWATER. XXX OTHER WELL HEAD P I D READING 0 0 PPM <br /> ICASING ELEVATION FEET MSL CASING DIAMETER: 2 INCH <br /> DEPTH TO WATER: 31 60 FEET CALCULATED CASING VOLUME. 3 21 GAL <br /> DEPTH OF WELL: 51 28 FEET ITOTAL VOLUME PURGED 10 5 GAL <br /> TIME VOLUME pH EC TEMP O.R.P COLOR OTHER <br /> gallons units - Umhos/cm Degrees C Mvolts Visual <br /> 0 83 1273 188 NIA TURBID MUSTY ODOR <br />' u GRE <br /> 35 86 1297 191 <br />' <br /> 70 86 1302 195 LL FUEL ODOR <br /> 105 85 1315 196 u <br />' PURGE METHOD 3 FOOT STAINLESS STEEL BAILER WITH ELECTRONIC BAILER SPOOL <br /> SAMPLE METHOD: T STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE. DEPTH TO WATER AT SAMPLE TIME <br />' WELL INTEGRITY CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS GOOD RECHARGE <br /> WEATHER CLOUDY SKIES <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br />' IN THE FIELD WITH STEAM CLEANER &ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION NORTH EAST <br />' CONTAINMENT POLY DRUMS <br /> INSTRUMENTATION- ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 5806 PHOTO IONIZATION DETECTOR <br />