My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009835
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
ARCHIVED REPORTS XR0009835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:40:22 PM
Creation date
7/30/2019 1:09:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009835
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Bank of Stockton - Cutter Lumber Site Page 6 <br /> Quarterly Groundwater Monitoring Report <br />' Project No 102 2 <br /> February 25,2003 <br />' 3.0 DISCUSSION <br />' 3 1 Discussion of Data <br />' Field and analytical data results are summarized in Tables 1 and 2 and <br /> illustrated in Figures 3 through 5 <br />' The map of the groundwater surface (Figure 3) suggests that the flow of <br /> groundwater is to the northeast The water table has risen over a foot since the <br /> last monitoring event in September of 2002 The direction and gradient of flow <br />' have remained generally consistent over the entire time the wells have been <br /> monitored <br />' In general, the analytic data suggest that contaminant levels are gradually <br /> decreasing except in the area of MW-8B and MW-7, near the core of the plume <br /> It appears that the lateral extent of the contaminant plume may also be <br />' gradually decreasing The wells MW-10 and MVP-11, at the distal periphery of <br /> the plume have been producing samples with non-detectible levels to petroleum <br /> • contaminants <br /> 3.2 Future Work Schedule <br />' Quarterly groundwater monitoring and sampling should continue Sometime <br /> ago, Geo-Phase Environmental submitted a Work Plan that proposed pilot level <br />' remedial work to investigate possible methods to achieve an adequate level of <br /> mitigation of this site The Work Plan was approved by the LOP agency, and on <br /> February 7, 2002 a detailed budget covering the work was submitted to the <br />' State UST Clean-up Fund for pre-approval of the associated costs The pre- <br /> approval request was dust recently granted and the work has begun Two new <br /> service wells were construct on February 21, 2003 The wells will be used in the <br />' pilot test, which will commence after the surface facilities have been constructed <br /> I <br />' 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.