Laserfiche WebLink
' Bank of Stockton- Cutter Lumber Site Page 6 <br /> Quarterly Groundwater Monitoring Report <br /> I <br /> Project No 102 2 <br /> le April 24, 2002 <br />' 3 0 DISCUSSION <br />' 31 Discussion of Data <br /> Field and analytical data results are summarized in Tables 1 and 2 and <br /> illustrated in Figures 3 through 5 <br /> The map of groundwater gradient (Figure 3) suggests that the flow of <br /> groundwater is to the northeast The water table has risen over 2 feet since the <br /> last monitoring event in December of 2001 The direction and gradient of flow <br />' have remained generally consistent over the entire time the wells have been <br /> monitored, although in this event <br />' In general, the analytic data suggest that contaminant levels are gradually <br /> decreasing except in the area of MW-SB and MW-7, near the core of the plume <br /> It appears that the lateral extent of the contaminant plume may also be <br />' gradually decreasing The wells MW-10 and MW-11, at the distal periphery of <br /> the plume have been producing samples with non-detectible levels to petroleum <br />' contaminants <br /> 3.2 Future Work Schedule <br /> Quarterly groundwater monitoring and sampling should continue Recently, <br /> Geo-Phase Environmental submitted a Work Plan that proposed pilot level <br />' remedial work to investigate possible methods to achieve an adequate level of <br /> mitigation of this site The Work Plan has been approved by the LOP agency, <br /> and a detailed budget covering the work has been submitted to the State UST <br />' Clean-up Fund for pre-approval of the associated costs <br /> I <br /> 2937 Veneman Ave,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> 1 <br />