Laserfiche WebLink
' Bank of Stockton-Cutter Lumber Site Page 8 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 102 2 <br /> April 11, 2001 <br />' 5.0 SIGNATURES AND CERTIFICATION <br /> This project was performed by Geo-Phase Environmental Inc in accordance with accepted <br />' professional standards for environmental consulting work, accepted and in effect at the time <br /> of this investigation except as may be otherwise set forth above <br />' This report was prepared b <br /> P P P Y <br />' Geo-Phase Environmental Inc. EQ cl <br /> STEPHEN b! r <br /> I lNXW <br /> NM 4'281 � <br /> Stephen M Lankf FGF CA `F <br /> Registered Geologist# 4283 <br /> Registered Environmental Assessor #4459 <br /> I <br /> I � <br /> 1 <br /> 1 <br /> 2937 Veneman Ave,#B240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0293 <br />