Laserfiche WebLink
1 Bank of Stockton-Cutter Lumber Site Page 2 <br /> Quarterly Groundwater Monitoring Report <br />' Project No 102 2 <br /> • April 11,2041 <br /> t1.2 Scope of Work <br /> The following work was completed during this round of groundwater monitoring <br /> 1 1 The depth to groundwater was measured in all eight wells remaining on the site <br />' 2 Groundwater monitoring included sample collection from six of the eight extant wells <br /> 3 Removal and disposal of purge water from two prior monitoring events <br /> lie <br /> 1 <br /> 1 <br /> i <br /> • <br />' 2937 Veneman Ave,#5240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0293 <br />