Laserfiche WebLink
' Bank of Stockton-Cutter Lumber Site Page 7 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 102 2 <br /> January 24,2001 <br />' 5.0 SIGNATURES AND CERTIFICATION <br /> This project was performed by Geo-Phase Environmental Inc in accordance with accepted <br />' professional standards for environmental consulting work, accepted and In effect at the time <br /> of this investigation except as may be otherwise set forth above <br />' This report was prepared b <br /> p p P Y <br />' Geo-Phase Environmental Inc. <br /> STEP -N 14 <br /> IINsKFORD <br /> I Stephen M Lankfo , <br /> Registered Geolo 1st # 4283 s�9 No x283 <br /> Registered Environmental Assessor #4459 6F cA1�� <br /> I <br /> I <br /> 2937 Veneman Ave,##B240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0293 <br />