Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br />' MONITORING WELL FIELD LOG 2000 <br />' SAMPLE LOCATION/MW- 11 DATE: 4125/00 <br />' PROJECT NAME. CUTTER LUMBER ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS 3430 S ELDORADO SAMPLE TIME. 1450 <br /> CITY,STATE- STOCKTON,CALIF SAMPLE CONTAINERS 2 VOA'S& I B B <br />' SITE CONTACT PRESERVATIVES HCL <br /> CONSULTANT- GEO-PHASE ENVIRONMENTAL LAB.ANALYSIS BY: SHERWOOD <br />' PROJECT MANAGER. STEVE LANKFORD MONUMENT: FLUSH <br /> SAMPLER: DEL-TECH WELL CASING MATERLAL PVC <br /> SIGNED: WELL CASING DIA - 2" / 01632 <br /> SAMPLE MED GROUNDWATER P.I.D.READING/ODOR N/A NONE <br />' TOP OF CASING ELEVATION- MSL COLOR- GREY TO CLEAR <br /> DEPTH TO WATER: feet.lWth's 2586 FEET CALC.PURGE VOL. 3 1416 GAL <br /> DEPTH OF WELL: feet.lWth's 4511 FEET TOTAL VOLUME PURGED: 9 GAL <br />' STANDING WATER COLUMN• 1925 FEET DEPTH OF PUMP 35 FEET <br /> FIELD PARAMETERS <br /> TIME CUMULATrvT DRAW sUB11IERSI pH E.C, TEMP ORP. DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> I PER PURGE (D T W (GPIAILPI Q (units) (UsMH03) (CeWm) (Mvolts} (PPM) (N T U) <br /> 0 N/A 1 GPM 801 1197 203 -30 06 GREY <br /> 3 " 809 1121 199 -64 08 CLEAR <br />' 6 " 805 1155 199 -116 08 " <br /> 9 " 808 1171 20 -136 08 " <br />' PURGE METHOD PURGER PUMP <br /> SAMPLE METHOD F STAINLESS STEEL BAILER W/STAINLESS STEEL WIRE LINE <br />' D T W AFTER PURGE D T W.AT SAMPLE TIME 30 51' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE AMERICAN LOCK INSTALLED <br /> WELL LOCATION SEE SITE MAP <br />' REMARKS <br /> WEATHER CLEAR SKIES WIND NW5 <br />' QUALITY CONTROL ALL PURGING E UIPMENT AND SAMPLING 8 UIPMENT WAS CLEANED IN THE <br /> FIELD WITHA STEAMCLE4NER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D O T 17 35 GAL STEEL DRUM OR 60 GAL POLY DRUM <br />' INSTRUMENTATION Y S 13560 FLOWCELL Y S G DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THERMODINE SBOB P I D <br /> KECK INTERFACE METER TURBIDITY METER <br />